New 12v 7.2ah Long (Lead-Acid) UPS Battery

For sale by: MD. Abdur Rahman Nayan, 19 Jan 2021 06:27 am Location: Dhaka, Dhaka, Jatrabari

  • New 12v 7.2ah Long (Lead-Acid) UPS Battery
  • New 12v 7.2ah Long (Lead-Acid) UPS Battery
  • New 12v 7.2ah Long (Lead-Acid) UPS Battery
  • New 12v 7.2ah Long (Lead-Acid) UPS Battery
  • New 12v 7.2ah Long (Lead-Acid) UPS Battery
Shere This Ad:
                                            Product details of 12v 7.2ah Long (Lead-Acid) UPS Battery ( Excellent Backup-Long 7Ah/12V Lead-Acid) 12v 7.2Ah

Battery Type – 12V 7.2Ah batteries
Ease of mind – Maintenance-free operation.
Used for back up solutions
User-friendly – easy installation with a very durable and rugged construction
Trusted and highest reviewed sealed lead acid batteries
Long service life, float or cyclic applications
Very Low self-discharge
Absorbent Glass Mat (AGM) & GEL technology
Battery Type – 12V 7.2Ah batteries
Ease of mind – Maintenance-free operation.
Used for back up solutions
User-friendly – easy installation with a very durable and rugged construction
Trusted and highest reviewed sealed lead acid batteries
Long service life, float or cyclic applications
Very Low self-discharge
Absorbent Glass Mat (AGM) & GEL technology
Specifications of 12v 7.2ah Long (Lead-Acid) UPS Battery ( Excellent Backup-Long 7Ah/12V Lead-Acid) 12v 7.2Ah
Brand

No Brand

SKU

131948963_BD-1052570643

What’s in the box

1

Product details

Manufacturer : Long

ASIN : B081VFQHVP

Item model number : WP7-1

External Product ID : NA
Compatible with : Multi
External Product ID Type : Not Available
Battery Model Number : WP7-12
Rechargeable : Yes
Battery Capacity : 7 - 7.5 amp_hours
Brand : Long
Made in Vietnam

SHOP NAME: NIIT COMPUTER JATRABARI (NAYAN),

ADDRESS: 45/1, WEST JATRABARI (NEARBY JOSNA HOTEL/GOOGLE SEARCH SUBORNA DENTAL NEAR MY SHOWROOM), DHAKA-1204,

CONTACT: MD. ABDUR RAHMAN (NAYAN),অল বাংলাদেশ প্রোডাক্ট ডেলিভারি দেওয়া হয় ।
ফোন নাম্বার : 01678761887

OTHERS CONTACT(24-HOURS):- FACEBOOK/IMO/VIBER/INSTAGRAM/WHAT SUP/SNAP CHAT/ WE CHAT- MD.ABDUR RAHMAN (NAYAN)

INSIDE DHAKA AVAILABLE NOW HOME/OFFICE DELIVERY(24/48/72-HOURS) ON TERMS & OUTSIDE DHAKA DELIVERY IN S.A/JANANI/RAINBOW/SUDHORBAN ETC PARIBAHAN POSSIBLE (ALL ICT PRODUCT PRICE ALWAYS CHANGED)                                    

Similar ads


New Moriom Borka স্টোনের কাজের মধ্যে
New Moriom Borka স্টোনের কাজের মধ্যে

19 Aug 2025 11:38 pm

TK 1,599

Mini UPS for wifi router and onu
Mini UPS for wifi router and onu

16 May 2024 09:20 pm

TK 1,590

APOLLO 650VA 300W UPS
APOLLO 650VA 300W UPS

20 Dec 2025 12:19 am

TK 1,550

Vertiv ITON CX 650VA Offline UPS
Vertiv ITON CX 650VA Offline UPS

20 Dec 2025 12:19 am

TK 1,550

K-Snake New Gaming Combo Full Fresh
K-Snake New Gaming Combo Full Fresh

30 Jan 2023 07:13 am

TK 1,550

NEW High-grade Battery for Asus K43U 4400mAh, 6 cells
NEW High-grade Battery for Asus K43U 4400mAh, 6 cells

02 Aug 2023 07:47 am

TK 1,550

Adata SSD 256 (NEW)
Adata SSD 256 (NEW)

01 Dec 2023 09:09 am

TK 1,550

Baseus E19 wireless airbud Brand New
Baseus E19 wireless airbud Brand New

26 Jan 2025 07:02 pm

TK 1,550

The Best Dental Implant Clinics in New Zealand bikrisohoj
The Best Dental Implant Clinics in New Zealand bikrisohoj

27 Sep 2025 12:19 pm

TK 82,540,000

The Best Hair Implant Clinics in New Zealand bikrisohoj
The Best Hair Implant Clinics in New Zealand bikrisohoj

13 Sep 2025 06:34 pm

TK 79,600,000

Building(Condition New)
Building(Condition New)

16 Jun 2020 09:05 am

TK 75,000,000

Brand New Ready Flat for Sale, South Face - Uttar Badda
Brand New Ready Flat for Sale, South Face - Uttar Badda

22 Oct 2025 12:43 am

TK 14,000,000

Brand New 3-Bed Flat for Sale in Bashundhara
Brand New 3-Bed Flat for Sale in Bashundhara

02 Jul 2026 09:58 am

TK 13,700,000

New flat for sale in prime location In Mohammadpur.
New flat for sale in prime location In Mohammadpur.

26 Mar 2025 01:45 pm

TK 13,500,000

1530_sft Brand New Ready Flat Sale@Bashundhara H Block
1530_sft Brand New Ready Flat Sale@Bashundhara H Block

10 Dec 2025 11:53 pm

TK 13,000,000

X corolla 2005 New Shape
X corolla 2005 New Shape

17 Jan 2024 11:01 am

TK 12,400,000

More ads from MD. Abdur Rahman Nayan


GIGASONIC 19 inch HD LED Monitor
GIGASONIC 19 inch HD LED Monitor

18 Jun 2020 07:33 pm

TK 3,900

Asus H61M-K DDR3 3rd Gen.LGA1155 Socket Mainboard (VGA)
Asus H61M-K DDR3 3rd Gen.LGA1155 Socket Mainboard (VGA)

18 Jun 2020 11:04 pm

TK 7,300

Refublised Desktop memory ram support DDR1 512MB
Refublised Desktop memory ram support DDR1 512MB

19 Jun 2020 09:15 am

TK 500

Refublised Desktop DDR1 1GB PC3200 DDR 400 MHZ 184-Pin RAM
Refublised Desktop DDR1 1GB PC3200 DDR 400 MHZ 184-Pin RAM

19 Jun 2020 11:15 am

TK 800

Replacement 40W HP Mini 210 Adapter Charger
Replacement 40W HP Mini 210 Adapter Charger

19 Jun 2020 11:15 am

TK 800

Replacement Dell Laptop Battery N4030 Capacity 5200 mAh
Replacement Dell Laptop Battery N4030 Capacity 5200 mAh

19 Jun 2020 11:16 am

TK 1,300

TP-Link WR845N 300Mbps Wireless N Router
TP-Link WR845N 300Mbps Wireless N Router

19 Jun 2020 11:16 am

TK 1,900

Refublised Desktop Bulk Asus P5KPL Motherboard
Refublised Desktop Bulk Asus P5KPL Motherboard

19 Jun 2020 11:17 am

TK 2,200

New Esonic Genuine G31 DDR2 motherboard
New Esonic Genuine G31 DDR2 motherboard

19 Jun 2020 11:18 am

TK 2,500

New Dell Inspiron N4050 14R Laptop Motherboard Intel
New Dell Inspiron N4050 14R Laptop Motherboard Intel

20 Jun 2020 07:46 pm

TK 7,000

Tp-link Archer c20 AC750 Dual Band Router
Tp-link Archer c20 AC750 Dual Band Router

21 Jun 2020 06:22 am

TK 2,500

Replacment HP Mini 19.5v 2.05a 40w AC Laptop Adapter
Replacment HP Mini 19.5v 2.05a 40w AC Laptop Adapter

21 Jun 2020 06:17 pm

TK 800

Tenda Model O3 5km Outdoor Point To Point CPE Pair
Tenda Model O3 5km Outdoor Point To Point CPE Pair

21 Jun 2020 06:22 am

TK 11,000

B450M DS3H AM4 AMD Micro ATX Motherboard
B450M DS3H AM4 AMD Micro ATX Motherboard

21 Jun 2020 06:20 pm

TK 8,200

AMD Ryzen 3 2200G Quad-Core Processor
AMD Ryzen 3 2200G Quad-Core Processor

21 Jun 2020 06:20 pm

TK 11,500

Dell E1916H 18.5 Inch LED Monitor (VGA+DP)
Dell E1916H 18.5 Inch LED Monitor (VGA+DP)

22 Jun 2020 06:18 am

TK 6,100